Dear LHCb colleagues
As published some weeks ago, we will have a front-end - DAQ - controls 
workshop at CERN from Tuesday, May 15 at 14:00 to Friday, May 19 at 12:00.
The workshop starts Tuesday at 14:00 to enable people to arrive Tuesday morning 
and finishes friday at noon to enable people to return home friday afternoon.
The general outline of the workshop is planned to be quite similar 
to our workshop last year. Informal discussions of the different subjects 
are encouraged to enable us to get a good overview of all the potential 
problems in the different parts of the experiment. Each sub-detector group 
should send experts working in the different subjects and their specific 
requirements/problems should be identified the best possible beforehand.
Tuesday, May 16, afternoon:     Front-end
Wednesday, May 17:              Front-end
Thursday, May 18:               TFC - DAQ - Controls
Friday, May 19, morning:        Workshop summary and AOB.
A first preliminary agenda of the workshop is given below (please comment). 
Any volunteers to make presentations of specific problems/solutions in 
sub-detectors in any of the given subjects are most welcome ! (just 
send us an Email). If specific problems in sub-detectors are known 
it is recommended to prepare an overhead or two of the problem to be 
shown during discussions.
----------------------------------------------------------
=====================   FRONT-END   ======================
----------------------------------------------------------     
Organizer: Jorgen Christiansen
Tuesday afternoon: 14:00 - 18:00, Room 160 - 1 - 009
Radiation environment
        Radiation level estimates                       G. Holtey/V. Talanov (TBC) 20'
        Location of electronics                         Daniel Lacarrere (TBC)  15'
        Qualification of electronics                    Jorgen Christiansen     20'
        Discussion                                      All                     30'
Access to electronics in cavern and detectors
        Access procedure, Access periods                Hans Jurgen Hilke       20'
        Discussion (Reliability/redundancy)             All                     20'
Power supplies
        Standardization, location, radiation            Jorgen Christiansen     20' 
        Magnetic stray fields in cavern                 Wilfried Flegel (TBC)   20'
        Discussion                                      All                    
20'                       
Grounding:
        Vertex detector (grounding, copper links, etc.) Raymond Frei            20'
        Discussion                                      All                     20'

Wednesday morning: 9:00 - 13:00, Room 104 - RB - 09 Front-end error conditions Overview (sources, propagation,rates, recovery) Jorgen Christiansen 20' Discussion All 30' Resets Physics loss related to resets Hans Dijkstra 20' Reset types, reset scenarios Jorgen Christiansen 20' Discussion (agreement required now) All 30' Synchronization: Standard bunch collision synchronization Jorgen Christiansen 20' Board to board synchronization Dominique Breton (TBC) 20' Discussion (special problems: Muon, OT, etc.) All 20' Wednesday afternoon: 14:00 - 18:00, Room 160 - 1 - 009 L1 buffer Buffer size requirements Hans Dijkstra/Volker Lindenstruth 20' Discussion (cost, expandability, etc.) All 20' Interface to trigger systems: Data from trigger systems Hans Dijkstra 15' Monitoring trigger systems Hans Dijkstra 15' Discussion All 20'

Front-end multiplexing Functions + Link technology/protocol Francios Bal/Hans Muller 20' Discussion (Rates, distances, etc.) All 20'

---------------------------------------------------------- ===================== DAQ ====================== ---------------------------------------------------------- Organizer: Beat Jost Thursday morning: 9:00 - 13:00, Room 160 - 1 - 009 TFC (timing and fast control) Status/Partitioning: Beat Jost 20' Requirements to readout supervisor Richard Jacobsson 20' Discussion All 20' Throttling Infrastructure, dead time, monitoring Beat Jost 30' Discussion All 30'

Readout unit Data formatting, error handling, performance Hans muller 30' Discussion All 20' ---------------------------------------------------------- ===================== CONTROLS ====================== ---------------------------------------------------------- Organizer: Clara Gaspar Thursday afternoon: 14:00 - 18:00, Room 160 - 1 - 009 Vertex detector control: Motors, Vacuum, Cooling, LHC machine interface Massi Ferro-Luzzi 20' Control requirements from sub-detectors Summary Clara Gaspar / Andre Augustinus 30' Discussion All 30' Chip level controls Control system for CMS tracker Beat Jost 30' Long distance I2C/JTAG Jorgen Christiansen 5' Discussion All 20' Board level controls Credit card PC's/local control bus Beat Jost 30' Firewire Geneva Engineering school (TBC) 10' Discussion All 20' General ECS infrastructure Clara Gaspar 30' ---------------------------------------------------------- ===================== SUMMARY ====================== ---------------------------------------------------------- Organizer: Beat + Clara + Jorgen Friday morning: 9:00 - 13:00, Room 160 - 1 - 009 General summary and conclusions with on-line discussions Summary of Front-end Jorgen christiansen 60' Summary of DAQ: Beat Jost 60' Summary of controls: Clara Gaspar 60'