LHCb
Technical Coordination
Technical board summaries
1999
2000
2001
- 25.01.01 (.pdf): LHC schedule, Beam pipe/Tracking, Outer Tracker, RICH recommendation on PD, ...
- 12.02.01: LHC/LHCb schedule, news from beam pipe and tracking, ECS and L1 recommendation, VELO sensor decision, ...
- 20.04.01 (.pdf): Muon TDR, VELO TDR, beam pipe, tracking+T11, IT
technology
- 07.05.01 (.pdf): TDR Muon and VELO, RICH2/M1 interference, CAL-EDR
- 03.12.01 (.pdf): TDR Online/ECS, RICH Photo Detector review, Tracking/LHCb light, ..
2002
- 18.02.02 LHCb schedule, Test Beam 02-06, LHCb light,
Halogen free PCB LHC Experiment-Machine signal exchange WG, ...
- 27.05.02 (.pdf): LHCb light, Milestones, Radiation Hardness, EDR (RICH, Preshower), HPD status, Parameter Ex. signals, Coord. Sys.
- 16.09.02 (.pdf): RICH PD review, electronics review(L0, VELO), Milestones, LHCb-light schedule ...
- 11.10.02 (.pdf): Inner Tracker TDR, Report on the LHCC meeting, L1 Trigger Review
- 25.11.02 (.pdf): LHCb-Light/M1 set-up, Trigger TDR, RRB outcome/budget matters, Common L1 FE module, Milestones and Schedules
- 11.12.02 (.pdf): Addendum to the Muon TDR, Status of the Photon Detector, RICH1, B-field and Trigger
2003
- 23.01.03 (.pdf): VELO design review, VELO front-end chip, Photon Detector Review
- 27.02.03 (.pdf): Report on the Beetle review, Location of the computing farm, Level-1 front-end parameters, Photon detector
- 20.03.03 (.pdf): L1 Trigger, Report on the CARIOCA Review, Status of system schedules
- 23.05.03 (.pdf): Report on the Muon MPWC EDR and Muon FE Architecture Review, combined DAQ/L1, Photon detector: review conclusions, Presentation and approval of schedules